We also finished painting & touching up the iron railings, did some carpentry in the entry-way, and got rid of about a pickup truck load of garbage. That's about it, but I was pretty happy with getting that much done on a Sunday evening.
Monday, November 26, 2007
First Coat of Beige
Last night was a very productive night. We started and finished the first of the two coats of beige (the upper half of the dining room) throughout the entire restaurant. Jeff and Ali were here helping for a little bit, then Tiffany and Zach Ball and I put in a really long evening and got it done.
We also finished painting & touching up the iron railings, did some carpentry in the entry-way, and got rid of about a pickup truck load of garbage. That's about it, but I was pretty happy with getting that much done on a Sunday evening.
We also finished painting & touching up the iron railings, did some carpentry in the entry-way, and got rid of about a pickup truck load of garbage. That's about it, but I was pretty happy with getting that much done on a Sunday evening.